Validator Archive — October 2025 Port-Status Verification Logs

This archive contains the earliest publicly recorded Cozumel port-status verification entries observed during October 2025. Records in this month reflect the initialization phase of the Trust & Transparency Validator dataset and the first documented verification cycles conducted under the established monitoring process.

Entries document publicly observable information sourced from official bulletins issued by the Capitanía de Puerto de Cozumel and Protección Civil. Each record includes the verified port status, ISO-8601 timestamp, and confirmation of synchronized public-surface updates where applicable.

Note: The Trust & Transparency Validator dataset was initiated in late October 2025. As a result, this archive includes system initialization records and first-cycle continuity entries prior to full month-length coverage. Terminology and formatting in this archive reflect the operational conventions in use at the time of recording and may differ from later standardized formats.

All entries are preserved unaltered for historical reference, transparency of process, and machine-readable continuity.


How This Month Archive Works

Each daily entry below reflects the exact wording used on the Trust and Transparency Validator page, including:

  • Verified port status (OPEN / CLOSED / RESTRICTED)
  • Whether an official change or no-change condition occurred
  • Full ISO-8601 timestamp of verification
  • Confirmation that Website, Facebook Page, and YouTube surfaces were updated
  • File-integrity confirmation for all required screenshots
  • The sealed validator note recorded for that day

This archive preserves unaltered historical records for October 2025.


October 2025 Daily Timestamps

3) Daily Timestamp Log (Verification Record)

October 2025 Log — Year/months are archived here → Validator Archive — Cozumel Port Status Verification Logs

2025-10-31 – 11:20 AM Cozumel local – Status Verified: Port Status transitioned from ‘Reopened’ (8:30 AM) to ongoing ‘Open (Status Verified)’ – no new bulletins issued – Website, Facebook and YouTube (static update confirmed); ISO: 2025-10-31T11:20:00-05:00.  

2025-10-31 – 8:30 AM Cozumel local – Status Verified: OFFICIAL REOPENING – PORT OPEN – Website, Facebook & YouTube Short posted – verified via Capitanía de Puerto de Cozumel (official reopening bulletin) relayed by Protección Civil / SEMAR; ISO: 2025-10-31T08:30:00-05:00.

2025-10-30 – 11:10 AM Cozumel Local Time: Second status scan completed. No official change detected from Capitanía de Puerto de Cozumel or Protección Civil. No additional post required. Status remains open.

2025-10-30 – Status verified at 8:30 AM Cozumel local time; official port bulletin confirmed via Capitanía de Puerto de Cozumel, Protección Civil, and SEMAR; updates published to Website, Facebook, and YouTube within synchronized time window.

2025-10-29 – Port Status + Facebook + YouTube Shorts successfully synced within 5-minute window. All three surfaces executed live at 8:30 AM Cozumel time (Stage 1 compliance maintained).

2025-10-28 – Port Status + Facebook sync maintained. YouTube sync activated. AI Access Policy added to Trust and Transparency Validator page.

2025‑10‑27 – Trust Validator Page created; Port Status + FB sync maintained; homepage hero under revision


Return to 2025 Archive

Back to 2025 Year Archive →
/validator-archive/y-2025/